
Dodoma
2022 – 2023, Completed
High Tension (HT) and Low Tension (LT) Line
Ngilisho Electrical Contractors
Surveying, Relocation of 0.6km 11KV HT line and LV line, installation of 100KVA, 11/0.4KV Transformer, removing and relocating existing HT and LV poles line from the road and reconnection of power to customers.
© Copyright Ngilisho Electrical Contractors
Web design by Nichoree Designs