General Electrical Maintenance Of Indoor Transformer Substation at Kambarage Tower Building in Dodoma
Project Summary
CLIENT
Prolaty Consult Ltd
LOCATION
Hazina Area along JK Kikwete road, Dodoma
FACILITY TYPE
Indoor Transformer Substation
START - FINISH | DURATION
2022, Completed
CONTRACTOR
Ngilisho Electrical Contractors
SERVICE | PROJECT SIZE
Consultation, General Maintenance of 1250KVA ,33/0.4KV transformer, maintenance and general services of switchgear/ circuit breaker, maintenance of Underground HT cable, transformer oil filtration, oil breakdown voltage test (dielectric strength test) and others in order to ensure power availability and better performance of the transformer.
PROJECT DETAILS
Maintenance of 1250KVA ,33/0.4KV transformer which included visual inspection, recording & tightening of terminals, check & test Buchholz relay operation & pressure release device, carry-out winding resistance, earth resistance & insulation resistance measurement test, silica-gel replacement, check Oil leakage along all welded joint, gasket joint and plugs, maintenance and general services of switchgear/ circuit breaker, maintenance of Underground HT cable, transformer oil filtration, oil breakdown voltage test (dielectric strength test) and others in order to ensure power availability and better performance and lifespan of the transformer.